Popular Cycling Routes - Construction Updates
Reporting Area Trail Conditions - "Who ya gonna call?"
Click the button below to see a complete list of local trails and who to contact regarding trail conditions, problems, etc.
Construction - Path Maintenance Contacts INCOG's Tulsa Regional Trails Maintenance Contacts PDF
Area Trail Information
INCOG Area Trails Guide provides a more extensive reference for all area trails.
INCOG - Area Trails Guide
Construction and conditions compiled by Tulsa Bicycle Club membership ...
Info last updated: 3/11/2025
Jenks RiverWalk Area repaving
The parking lot and half of the road connecting Los Cabos and the golf driving facility has had the base layer ground down for repaving. Watch for drop offs and construction equipment.
East Bank trail closure behind River Spirit Casino
The trail behind the casino is currently scheduled to reopen the week of March 18th. Detour will be the old trail between Riverside and the casino complex.
Snake Creek bridge (201st between Mingo and Memorial) The bridge appears to be complete. As of the last week of January a check showed that the approaches are under construction. .
Case park in Sand Springs Hwy 97 trail entrance closed
The entrance to the park off of Hwy 97 is still closed. This time there is a drainage project just to the west of Hwy 97. Park of the trail has been dug up and both sides of the construction are fenced off.
Riverparks West Bank Trail.
The west bank trail between Turkey Mtn and the sewage treatment plant
The trail is now closed and will probably be closed through the end of April Repair work to a sewer line under the trail is causing the closure
The bike lane side is closed to repair the sinkhole south of the 23rd street bridge. Cyclists are detoured to the pedestrian side